Portfolio

1303 Optical

Project: Construction

Ranscapes Solution: Transformed existing turf areas into a new patio. This renovation includes a custom seating area, poured in place concrete seat walls, water feature with multicolored bubblers, pavers, putting green, upgraded lighting, decorative pots, and landscape drip system.

eight 80

Project: Construction

Ranscapes Solution: Ranscapes was tasked with modernizing and sprucing up their courtyards, doggy park and main pool area. The result is a beautiful collage of color from the assortment of plants and flowers that were selected.

Los Angeles Parks

Project: Construction

Ranscapes Solution: Ranscapes was called to install 2 pockets parks in Los Angeles when a contractor failed to start the construction.  When W.E. O’ Neil called and our construction team jump right in. We finished the  projects a month ahead of schedule and under budget. We provided all the soft scape elements and our ISA certified arborist were onsite to oversee the 100 year old trees that needed to be protected. The parks have community gardens for the locals to enjoy, playgrounds and much more.

Marina Pointe

Project: Construction

Ranscapes Solution: Ranscapes demo’d existing courtyards, and remodeled into hardscape areas that includes BBQs, Fire pits, Planting areas, Amenities area, Breakfast bars, Water proofing systems, and established new concrete. Ranscapes also fixed and redesigned the Irrigation system.

Pacific City

Project: Arbor and Landscaping Management

Ranscapes Solution: Ranscapes has been conducting arbor and landscaping management for Pacific City since 2018. We were brought in to finish some design build elements and took over the arbor and landscaping management.

Playa Vista

Project: Construction

Ranscapes Solution: Ranscapes removed the Tifway Bermuda Turf and installed new sawcut concrete. A new drain system with catch basins had been installed, resolving the sports field drainage issues. Ranscapes also built various walkways, benches, and bleachers. Our in-house designed solution enabled the Playa Vista Community to enjoy the nightly soccer games.

Saddleback Church

Project: Construction

Ranscapes Solution: Ranscapes has had a maintenance contract with Saddleback Church for 11 years. As a trusted vendor, we were contracted to do a 250k renovation to the front entrance of their main campus. This project included a new monument sign, retaining wall, palm tree installation and installation of new plant material.

Shepherds Church

Project: Construction

Ranscapes Solution: This project was a design build in partnership with Visioneering and Landstudio 360. Custom baptismal pool that was constructed based on their needing it to be dry/without water 362 days out of the year. Stone veneer wall, radiused retaining wall with veneer cap, 2 fountains, 12 fire towers with a ledgestone veneer exterior  14k square foot of pavers, 3 fire boulders, radiused fire pit, 300 LF of seat wall with smooth stucco, new landscaping, and playground installation. Ranscapes completed this project 30 days early and came in under budget.

San Manuel Casino

Project: Construction

Ranscapes Solution: San Manuel Casino reached out to Ranscapes’ design team to help with the design build of their headquarters located in San Bernardino, CA. The project involvement included demolition of the existing courtyard, added pavers, lighting, stucco and concrete, low water usage, drip system and new monuments.

Ready to get Ranscaped? Let's connect.

Scroll to Top
Scroll to Top